Institutional Clean-Tech Capital & Commercial Energy Infrastructure
Master distribution of tier-1 commercial & industrial battery storage (BESS), fully-funded commercial solar PPAs for 50 kWp+ portfolios, and decentralized grid-scale energy hubs across Ireland and the UK.
Four Core Pillars of Commercial Energy Delivery
De-risking clean-tech infrastructure through institutional equity, verified EU battery master distribution, strategic land banks, and cross-border fiscal clearance.
1. UK Funded Solar PPAs (50 kWp+ Zero-Capex, 10-Yr Gifting)
Institutional clean-energy funds provide 100% Zero-Capex installation, tier-1 Bloomberg Tier-A panels, commercial inverters, and full 25-year operations & maintenance. Property owners lock in significantly discounted green electricity rates with guaranteed full asset gifting to the building owner at Year 10.
- Scale: 50 kWp minimum up to multi-megawatt commercial rooftop & ground arrays.
- Zero Balance-Sheet Debt: Fully off-balance sheet operating expense model.
- Turnkey Approvals: Fast-track structural, EPC and DNO grid authorization.
2. Tier-1 C&I BESS Master Distribution (High-voltage LFP storage, Slovenia EU forward stock)
Direct master distribution for high-voltage industrial Battery Energy Storage Systems (BESS) engineered with automotive-grade CATL/EVE LFP cells. Rapid dispatch directly from our bonded Slovenia EU forward-stock warehouse with zero lead-time delays and direct engineering support.
- Configurations: 100 kWh liquid-cooled cabinets to 2.5 MWh 20ft containerized stations.
- Revenue Stack: Peak shaving, Triad avoidance, DS3 fast frequency response & arbitrage.
- Cycle Life: 6,000 to 8,000 cycles at 90% DoD with smart cloud EMS monitoring.
3. Midlands Grid-Scale Infrastructure (Strategic Industrial Brownfields & Multi-Megawatt BESS)
Strategic development and origination across high-voltage industrial brownfield sites, logistics corridors, and transport nodes across the Irish Midlands. Deploying 10 MW – 50 MW decentralized grid-stabilization battery energy storage assets (BESS) supporting renewable integration and system security.
- Substation Connectivity: Optimized proximity to EirGrid 110kV and ESB Networks 38kV grid infrastructure.
- Brownfield Redevelopment: Utilizing existing heavy industrial hardstanding and logistics access; zero productive agricultural displacement.
- Grid Support (DS3): Providing localized fast-acting frequency response and capacity market services aligned with Ireland's CAP24 clean electricity targets.
4. Regulatory & Commercial Armor (EORI IE4167551LH, Postponed VAT, Fitzwilliam Hall D2)
Executed under Digital Traffic Genie Limited (CRO Reg 742948) with established Dublin 2 headquarters. Operating under registered Irish customs EORI (IE4167551LH) and EU Postponed Accounting for seamless frictionless equipment import and tax neutrality.
- Corporate Entity: Digital Traffic Genie Ltd (Trading as Mullach Energy).
- Direct D2 Presence: Fitzwilliam Hall, Fitzwilliam Place, Dublin 2, D02 T928.
- SignWell / DocuSign E-Execution: Standardized institutional term sheets and NDAs.
Technical Specifications for BESS & Solar PPAs
Standard institutional criteria for commercial solar installations and high-voltage BESS equipment.
| System Classification | Rating / Capacity | Capex Model | Lifecycle & Performance | Ownership Transfer | Dispatch & Logistics |
|---|---|---|---|---|---|
| UK Funded Commercial Solar PPA | 50 kWp – 2 MWp+ (Rooftop / Carport) | 100% Zero-Capex Funded | 25-Yr Full Maintenance Warranty | 10-Year Full Asset Gift | Tier-1 Bloomberg Tier-A Panels |
| C&I High-Voltage Liquid BESS | 100 kWh – 500 kWh Liquid-Cooled | Wholesale Master Distribution | 6,000+ Cycles (CATL/EVE LFP) | Full Client Asset Ownership | Slovenia EU Stock (48-Hr Ready) |
| 20ft Containerized Utility BESS | 1.2 MWh – 2.5 MWh Central Station | Direct Supply & Turnkey EPC | 10-Year Comprehensive Warranty | SPV / Institutional Fund | Article 42 Postponed VAT |
| Midlands Grid-Scale Energy Hubs | 10 MW – 50 MW / 40 – 200 MWh | Institutional Infrastructure JV | 15-Year DS3 Grid Stabilization | Irish Infrastructure SPV | Irish Midlands 110kV/38kV Access |
William Dunne, Managing Director, Mullach Energy
Managing Director overseeing clean-tech capital structuring, funded commercial solar PPA originations (50 kWp+ zero-capex portfolio installations), and direct master agency supply for commercial & industrial BESS battery racks from bonded EU forward inventory in Slovenia.
Discuss Your Property Portfolio or BESS Procurement
Whether you hold 50 kWp+ commercial rooftop space in the UK seeking zero-capex clean power, or require industrial high-voltage BESS container pricing from EU forward inventory, speak with our Dublin executive desk today.